contingent cost

英 [kənˈtɪndʒənt kɒst] 美 [kənˈtɪndʒənt kɔːst]

或有成本

经济



双语例句

  1. Such approval will not be contingent upon the payment of any fee or royalties to YYY; however, the cost of obtaining and maintaining such new trademarks shall be borne solely by the Company.
    公司不需要支付任何费用和许可费,但获得和维持该商商标的费用由公司自行承担。
  2. Fuzzy Credit Pricing Method for Contingent Claims with Transaction Cost
    具有交易费用的或有要求权的模糊估价方法
  3. In addition, the payouts for senior management, including Mick Davis, chief executive, would be contingent on the level of cost savings achieved in the merger.
    此外,包括斯特拉塔首席执行官米克戴维斯(mickdavis)在内的高级管理层的酬金,将取决于合并中实现的成本削减水平。
  4. Hedging Price and Hedging Strategy of a Contingent Claim with Transaction Cost
    有交易费用的未定权益定价及其套期保值策略
  5. The contingent valuation method ( CVM) is a simple, flexible non-market valuation method that is widely used in cost benefit analysis and environmental impact assessment.
    条件价值评估法(ContingentValuationMethod,CVM)是评估环境污染的经济损失价值的有效方法之一。
  6. The system "company-project department-construction contingent" is presented to manage and count the cost of construction company, and manage method of production cost, quality cost and time limit cost.
    本文论述了施工企业在成本管理过程中,应建立公司-项目部-施工队三级成本管理和核算体系,详细阐述了项目施工过程中,生产成本、质量成本、工期成本等的具体管理方法。
  7. Moreover, competitive dynamic is a crucial factor of firm strategic alliance formation, so ( dis) advantaged firm needs to make contingent strategic option according to the comparison of defended loss by competitor ′ s alliance activities with alliance cost.
    而竞争性动态是企业建立战略联盟的一个重要因素,强(弱)势企业的联盟战略需要根据竞争者联盟行为所带来的可预防损失与联盟成本的比较做出相机性战略选择。
  8. In our view, it is necessary to probe deeply in the concept of contingent cost control of audit projects. and design scientific control strategy to evade or control audit risk and improve audit performance.
    笔者认为,有必要深入研究审计项目或有成本控制理念、制定科学的控制策略,更好地规避审计风险、提高审计绩效。
  9. Secondly, this paper presents the appraisal method of the urban rail transit externality, including Contingent Value Method, Land Price Function Model, Transit Cost and Land Price theory, and Hedonic Price Method.
    其次,介绍了城市轨道交通外部性的评估方法,包括条件价值法、运输成本与地价理论和特征价格法等;
  10. The subsequent domestic rise of an introduction of the CRM boom, and contingent penetrate into more and more industries, but the engineering cost consultation industry in China as an emerging decentralized industry, has yet to implement CRM precedent.
    随后国内兴起了一股引进CRM的热潮,并渗透到越来越多的行业,但是工程造价咨询行业在我国做为一个新兴的分散型行业,却尚未有研究CRM推行的先例。